Riverwoods, Exeter, NH |
(2002-present) |
|
Client: JSA,INC, Portsmouth,NH |
|
Project Desciption: Complete structural design and drawings for ~200,000 SF 3 story Assisted Living/Senior Housing facility. |
|
Construction Type: Concrete/ structural steel/ light gage steel/ wood frame/ wood truss. |
|
Approximate Construction Cost:$24,000,000 |
| |
|
Exeter Hospital, Exeter,NH |
(2001-present) |
|
Client:JSA,INC, Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 4-story addition to Exeter Hospital. |
|
Construction Type: Concrete/ structural steel/ Composite beams/ light gage steel |
|
Approximate Construction Cost:$17,000,000 |
| |
|
Maine Psychiatric Treatment Center, Augusta, Maine |
(2001-present)
|
|
Client: JSA,INC Portsmouth,NH |
|
Project Desciption: Complete structural design and drawings for >125,000 SF 2 story psychiatric facility for the State of Maine. |
|
Construction Type: Concrete/structural steel/ light gage steel/ steel trusses. |
|
Approximate Construction Cost: $22,000,000 |
| |
|
Brunswick Naval Air Station Family Housing, Brunswick, Maine |
(2000-2001) |
|
Client: JSA,INC, Portsmouth,NH |
|
Project Description: Complete structural design and drawings for two story, cluster unit naval housing complex. |
|
Construction Type: Concrete/ wood |
|
Approximate Construction Cost: $8,000,000 |
| |
|
Newport
Station Lodge and Exchange, Newport,RI
|
(2000-2001) |
|
Client: JSA,INC, Portsmouth,NH |
|
Project Description: Complete structural design and drawings for two separate buildings. One is a two story wood framed hotel type housing facility and the exchange is a two story addition to an existing exchange facility. |
|
Construction Type: Concrete/ structural steel/ light gage steel wood |
|
Approximate Construction Cost: $12,000,000 |
| |
|
Franklin Pierce College Library Addition, Rindge,NH |
(2000-2001) |
|
Client: Eckman Construction, Bedford,NH |
|
Project Description: Complete structural design and drawings for third story addition to existing library. Addition is steel frame and rests on a cast in place concrete frame below with waffle slab construction. |
|
Construction Type: Concrete/ structural steel/ light gage steel/ wood |
|
Approximate Construction Cost: $2,000,000 |
| |
|
Opus 2, Portsmouth, NH |
(1999) |
|
Client: McNabb Construction, Portsmouth, NH |
|
Project Description: Complete structural design and drawings for three story downtown office addition to computer software company. Architectural design was done by Steve McHenry. |
|
Construction Type: Concrete /structural steel/ light gage metal. |
|
Approximate Construction Cost: $1,500,000 |
| |
| Archstone Communities, Stamford, CT |
(1999 - 2000) | |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for >200,000 SF 4 story apartment building with two additional levels of underground parking. |
|
Construction Type: Concrete/structural steel/wood framing/wood trusses. |
|
Approximate Construction Cost: $20,000,000 |
| |
|
Bethany Church, Greenland, NH |
(1999) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for church with over 50,000 SF of floor area. The building is over 75’ high. |
|
Construction Type: Concrete /structural steel/ light gage metal/wood truss & joist. |
|
Approximate Construction Cost: $3,000,000 |
 |
| |
|
28 Deer Street, Portsmouth, NH |
(1999) |
|
Client: H.L. Patten Const., Kittery, Maine |
|
Project Description: Complete structural design and drawings for four story downtown office building of approximately 12,000 SF. Architectural design was done by Lisa Destefano. |
|
Construction Type: Concrete /structural steel/ wood truss. |
|
Approximate Construction Cost: $1,500,000 |
 |
| |
Northeast Health Retirement Community, Camden, ME |
(1999 - 2000) |
|
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for >200,000 SF of retirement housing. Included are a |
|
157,000 SF Inn building with institutional facilities and numerous clustered independent housing units. |
|
Construction Type: Inn: concrete/precast concrete/structural steel /light gage steel /steel trusses. Clusters: wood frame. |
|
Approximate Construction Cost: $20,000,000 |
| |
|
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 80,000 SF 4 story medical offices building. |
|
Construction Type: Concrete/structural steel/joists/light gage steel. |
|
Approximate Construction Cost: $8,000,000 |
 |
|
|
| |
|
Keeney Manufacturing, Keene, NH |
(1999) |
|
Client: Opechee Construction, Belmont, NH |
|
Project Description: Complete structural design for a 200,000 SF manufacturing facility. The building is constructed of structural steel with concrete decks on steel joists. |
|
Approximate Construction Cost: $10,000,000 |
| |
|
The Farragut, Kennebunk, ME |
(1999) |
|
Client: Gilmore-Farragut of Maine, LLC |
|
Project Description: Complete structural design and drawings for adult housing complex. The project includes numerous attached single dwellings, 6-plexes, and a three story courtyard/Inn building. |
|
Construction Type: Concrete /structural steel/wood truss/engineered wood |
|
Approximate Construction Cost: $7,500,000 |
| |
Simplex Wire & Cable, Building Addition, Newington, NH |
(1998) | |
|
Client: Hutter Construction, New Ipswich, NH |
|
Project Description: Complete structural design and drawings for addition of clean rooms and storage areas within the main facility. |
|
Construction Type: Concrete /structural steel frame. |
|
Approximate Construction Cost: $4,000,000 |
| |
|
Simplex Wire & Cable, Second Floor Addition, Newington, NH |
(1999) |
|
Client: Fulcrum Associates, Amherst, NH |
|
Project Description: Complete structural design and drawings for 75,000 SF of addition at this facility. |
|
Construction Type: Concrete /structural steel frame. |
|
Approximate Construction Cost: $4,000,000 |
| |
|
Lindt-Sprungli, Stratham, NH |
(1998) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 100,000 SF addition to the famous Lindt chocolate factory. |
|
Construction Type: Concrete /structural steel frame/composite decks. |
|
Approximate Construction Cost: $5,000,000 |
| |
|
Exeter Ice Arena., Exeter, NH |
(1998) |
|
Client: Novel Iron Works, Greenland, NH |
|
Project Description: Complete structural design and drawings for 85,000 SF indoor skating arena and facility which contains two NHL rinks. JSN provided foundation and structural steel design on this fast track project. |
|
Construction Type: Concrete /structural steel frame. |
|
Approximate Construction Cost: $5,000,000 |
 |
| |
|
|
|
Client: H.L. Patten Construction, Inc., Kittery, ME |
|
Project Description: Complete structural re-design and drawings for 55,000 SF five story office and retail building. This redesign reduced the original design steel weight by almost 25%, saving over $130,000. |
|
Construction Type: Concrete /structural steel frame/composite decks/lightweight concrete. |
|
Approximate Construction Cost: $5,000,000 |
 |
| |
|
Spencer Press, Wells, ME |
(1998) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 141,000 SF addition to Spencer’s U.S. facility. |
|
Construction Type: Concrete /structural steel /steel truss |
|
Approximate Construction Cost: $8,000,000 |
| |
| Middlesex Assisted Living, Middleton, CT |
(1997) | |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 55,000 SF three story facility. |
|
Construction Type: Concrete /structural steel /light gage bearing walls & joists /steel trusses. |
|
Approximate Construction Cost: $5,000,000 |
| |
|
Killington Grand Summit Hotel, Sherburne, VT |
(1997) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 210,000 SF hotel located at Killington. |
|
Construction Type: Concrete /structural steel /wood truss /engineered wood products /timber |
|
Approximate Construction Cost: $17,000,000 |
|
|
| |
|
Mt. Snow Grand Summit Hotel, West Dover, VT |
(1997) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 200,000 SF hotel located at Mt. Snow. |
|
Construction Type: Concrete /structural steel /wood truss /engineered wood products /timber |
|
Approximate Construction Cost: $17,000,000 |
|
|
| |
|
Attitash Grand Summit Hotel, Barlett, NH |
(1996) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 150,000 SF hotel located at Attitash ski area. |
|
Construction Type: Concrete /structural steel /wood truss /engineered wood products /timber |
|
Approximate Construction Cost: $13,000,000 |
 |
| |
|
Sunday River Grand Summit Hotel, Newry, ME |
(1997) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 150,000 SF hotel located at Sunday River. |
|
Construction Type: Concrete /structural steel /wood truss /engineered wood products /timber |
|
Approximate Construction Cost: $15,000,000 |
| |
|
Best Western, Manchester, NH |
(1997) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for new hotel. |
|
Construction Type: Concrete /structural steel /wood truss /engineered wood products |
|
Approximate Construction Cost: $3,000,000 |
| |
|
U.S. Post Office, Manchester, NH |
(1997) |
|
Client: JSA, Inc., Portsmouth, NH |
|
Project Description: Complete structural design and drawings for additions and renovations to postal distribution building. |
|
Construction Type: Concrete /structural steel |
|
Approximate Construction Cost: $2,500,000 |
| |
| Franklin Pierce College Dormitory, Rindge, NH |
(1997-98) | |
|
Client: Eckman Construction Co., Bedford, NH - The Primary Group, Architects |
|
Project Description: Complete structural design and drawings for a new 50,000 SF three story dormitory building. |
|
Construction Type: Concrete /structural steel /wood roof truss |
|
Approximate Construction Cost: $3,500,000 |
|
|
| |
|
|
Client: Robert Rodier, Architect and Stafford Consulting Group LTD, Owner |
|
Project Description: Complete structural design and full construction drawing package for a four story office building located on Pleasant Street in Market Square, downtown Portsmouth. |
|
Construction Type: Concrete /structural steel /wood roof system |
|
Approximate Construction Cost: $1,200,000 |
 |
| |
|
Portsmouth Country Club, Portsmouth, NH |
(1997) |
|
Client: Platt/Hitchborn Architects, Exeter, NH |
|
Project Description: Complete structural design and drawings for new clubhouse building. |
|
Construction Type: Concrete /structural steel /wood truss /engineered wood products |
|
Approximate Construction Cost: $1,400,000 |
| |
|
The Inn of Hampton, Hampton, NH |
(1997) |
|
Client: Jasinski Architects, Waterville Valley, NH |
|
Project Description: Complete structural design and drawings for 20,000 SF 2-story steel frame addition. |
|
Construction Type: Concrete /structural steel /wood roof system |
|
Approximate Construction Cost: $1,400,000 |
| |
| 113 Bow Street, Portsmouth, NH |
(1996-97) |
|
Client: Joseph Sawtelle, 113 Bow Street Trust |
|
Project Description: Complete structural design and drawings for a six story condominium building located on the water’s edge. The building is constructed of structural steel with precast concrete deck and lower level beams. |
|
Approximate Construction Cost: $2,000,000 |
 |
| |
| York Technical College, Wells, ME |
(1996-97) | |
|
Client: Opechee Construction, Belmont, NH |
|
Project Description: Complete structural design and drawings for a 50,000 SF college building. The building is constructed of structural steel with steel /concrete decks on steel joists. |
|
Approximate Construction Cost: $3,000,000 |
|
|
| |
| World Gym, Portsmouth, NH |
(1996-97) | |
|
Client: Aring & Associates, Portsmouth, NH |
|
Project Description: Complete structural design and drawings for 20,000 SF renovations /additions to create a World Gym. The structure includes new pile foundations, structural steel, wood framing , and masonry. |
|
Approximate Construction Cost: $1,000,000 |
|
|
| |
| Belknap County Nursing Home, Laconia, NH |
(1995-96) | |
|
Client: Aring Schroeder Architects, Portsmouth, NH |
|
Project Description: Complete structural engineering /drawings /specifications for over 44,000 SF of additions and extensive renovation of existing facility. |
|
Construction Type: Concrete /CMU /light gage metal truss /structural steel |
|
Approximate Construction Cost: $6,000,000 |
| |
| Sullivan County Nursing Home, Unity, NH |
(1995-96) | |
|
Client: Aring Schroeder Architects, Portsmouth, NH |
|
Project Description: Complete structural engineering /drawings /specifications for approximately 30,000 SF of additions. |
|
Construction Type: Concrete /CMU /precast concrete /structural steel /light gage metal |
|
Approximate Construction Cost: $4,000,000 |
| |
| Seabrook School, Seabrook, NH |
(1995-96) | |
|
Client: Don Sumner Architects, Durham, NH |
|
Project Description: Complete engineering and design for 60,000 SF school addition |
|
Construction Type: Concrete /CMU /structural steel /wood truss |
|
Approximate Construction Cost: $2,500,000 |
| |
| Suncook Leathers, Pittsfield, NH |
(1995-96) | |
|
Client: Beloin Construction, Rochester, NH |
|
Project Description: Complete engineering and design for 55,000 SF of industrial building to replace one which burned. |
|
Construction Type: Concrete /CMU /pre-engineered steel /structural steel |
|
Approximate Construction Cost: $2,500,000 |
| |
| Berwick Academy, So. Berwick, ME |
(1995-96) | |
|
Client: Lassel Architects, So. Berwick, ME |
|
Project Description: Complete structural engineering /drawings /specifications for approximately 30,000 SF of additions including a field house and other athletic facilities. |
|
Construction Type: Concrete /CMU /pre-engineered steel /structural steel /wood frame |
|
Approximate Construction Cost: $2,300,000 |
| |
| NH College Dormitory, Hooksett, NH |
(1995-96) | |
|
Client: Opechee Construction, Belmont, NH |
|
Project Description: Complete structural engineering, drawings, and specifications for new 4-story 45,000 SF dormitory building. |
|
Construction Type: Concrete /structural steel /steel joist /light gage |
|
Approximate Construction Cost: $3,300,000 |
| |
| NH College Graduate School, Hooksett, NH |
(1995-96) | |
|
Client: Opechee Construction, Belmont, NH |
|
Project Description: Complete engineering, drawings, and specifications for new 2-story 40,000 SF building to be used as a graduate school. |
|
Construction Type: Concrete /structural steel /steel joist /light gage |
|
Approximate Construction Cost: $2,800,000 |
|
|
| |
|
NH College Restaurant & Hotel Management School, Hooksett, NH |
(1996) |
|
Client: Opechee Construction, Belmont, NH |
|
Project Description: Complete engineering, drawings, and specifications for 2-story 27,000 SF building to be used as a graduate school. |
|
Construction Type: Concrete /structural steel /steel joist /light gage |
|
Approximate Construction Cost: $1,900,000 |
|
|
| |
|
Salem Transfer Station, Salem, NH |
(1995) |
|
Client: Jewett Construction, Raymond, NH |
|
Project Description: Complete engineering, drawings, and specifications for new 20,000 SF solid waste transfer and recycling building. |
|
Construction Type: Concrete /pre-engineered steel. |
|
Approximate Construction Cost: $1,000,000 |
| |
| Coe-Brown Academy, Northwood, NH |
(1994-95) | |
|
Client: Lassel Architects, So. Berwick, ME |
|
Project Description: Complete structural engineering, drawings, and specifications for approx. 33,000 SF of new school buildings including classrooms, shops, gymnasium, etc. |
|
Construction Type: Concrete /CMU /structural steel /wood frame /light gage steel |
|
Approximate Construction Cost: $2,200,000 |
| |
| Piermont Bridge, Piermont, NH |
(1994-95) | |
|
Client: Civil Consultants, So. Berwick, ME |
|
Project Description: Complete structural analysis of 352 ft. clearspan bridge over the Connecticut River to determine the effects of containment enclosures on bridge stability under construction loading and wind conditions. |
|
Approximate Construction Cost: $2,200,000 |
| |
| |
 |
| |
|
Saco Island Deck, Saco, ME |
(1986) |
|
Client: Gar Properties |
|
Project Description: Working for Newstress International, Jeff Nawrocki provided complete structural design for a 70,000 SF precast deck which connected a series of mill buildings. The deck was designed for vehicular traffic, fire truck loading, and severe snow drifting. |
| |
|
Boston Red Sox Stadium, Fort Myers, FL |
(1992) |
|
Client: LEAP Associates, Tampa, FL |
|
Project Description: Working as a consultant to LEAP, Jeff Nawrocki provided structural engineering for the entire stadium structure. |
| |
|
Funworld Parking Deck, Nashua, NH |
(1991) |
|
Client: Newstress Int’l, Epsom, NH |
|
Project Description: JSN Associates provided complete structural design and drawings for a 20,000 SF precast parking deck using 60 ft. double tees, inverted tee beams, spandrel beams, and columns. |
| |
|
Underground Parking Deck, Loon Mt., NH |
(1985) |
|
Client: Newstress Int’l, Epsom, NH |
|
Project Description: Working for Newstress International, Jeff Nawrocki provided complete structural design for a 20,000 SF multi purpose underground facility that housed snow making compressors, racquetball courts, and parking, with a seasonal tennis court on top. |
|
|